Case Study: Haskell Server Room Upgrades

Dec 15, 2015


SITE:  Haskell Corporate Headquarters, Server Room

INSTALLER:  Zabatt Power Systems

SYSTEM OVERVIEW: Generac 80kW diesel generator set with aluminum outdoor enclosure, 48 hour fuel tank base and 200 amp automatic transfer switch

STORY:  Haskell was in the process of upgrading their Server Room with new state-of-the-art servers and UPS system and needed a standby generator to backup the new equipment. Zabatt received a call to help with the sizing, layout, and design of the standby system. During subsequent meetings to discuss the sizing and layout, it was clear that this project not only fell in line with Zabatt’s expertise in design but also in installation. Zabatt was able to offer a competitive turnkey project offering both the equipment and the installation.