SITE: Coastal Regional Commission of Georgia

INSTALLER: Zabatt Power Systems

SYSTEM OVERVIEW:  Aksa 150kw natural gas, sound attenuated enclosure, 400A ASCO automatic transfer switch.

STORY: This system was installed to back up a data center/server room. We were contacted to locate and install this equipment within a very short time frame to meet the customer’s timeline requirements. This required that all equipment meet the spec and be in stock & ready to ship. Zabatt was able to coordinate the purchase and removal of the existing 200KW Olympian generator, deliver, install and start up the new equipment within a few weeks. The purchase of the existing unit offset the cost of the gas connections and kept the job within budget.