SITE:  Vero Beach City Hall

INSTALLER:  Zabatt Power Systems

SYSTEM OVERVIEW: Aksa 250kW, Sound attenuated and wind rated enclosure, 3 breaker configuration, along with (3) Stainless ASCO series 300 NEMA 3R transfer switches.

STORY:  Zabatt was the successful bidder on this project. As a licensed building and electrical contractor, Zabatt has the means to get a project done right, and within budget. After the installation was completed, our technician performed a 2 hr load bank test to verify operation, and our customer has a 5 year warranty for peace of mind.