May Project Spotlight

May 28, 2024

SITE: Polk County – Ft.Mead Location

INSTALLER: Zabatt Power Systems

SYSTEM: Generac 20kw diesel, 120/240v 1 phase, aluminum enclosure, 130 gal base tank, remote Estop, NFPA 110 startup and load test. ASCO 100A 300 series ATS, 4X enclosure.

PROJECT OVERVIEW: Zabatt was awarded this project through two competitive bid processes, one to supply the generators, and another to provide the transfer switches and full installation, which included the concrete pads, permitting, fencing, and electrical work. As one of six sites, Zabatt worked closely with the county to provide project schedules and necessary grant documentation.  After installing generators at over 300 lift stations in the past few years, Zabatt has the processes to ensure a quality, cost-effective installation.