September Project Spotlight

Sep 17, 2024

SITE: Liberty Heathrow / CBRE

INSTALLER: Zabatt Power Systems

SYSTEM: HiPower 230kw diesel generator, 26-hour base tank, 230A ASCO delayed transition ATS, NFPA 110 start-up application.

PROJECT OVERVIEW: Zabatt was selected to replace the existing 200 kW generator with a new generator similar in size. Installation scope included adding 8″ of elevation to the existing generator pad, replacing the existing ATS, and fuel the generator. Zabatt is proud to partner with CBRE on generator installation projects in Florida. 

Contact Zabatt today for all of your generator needs!